    Cycle Time

    Elapsed time from when work on an item starts to when it is done; the core speed measure of delivery, best read as a percentile by work type.

    Category
    Process
    Role
    Input
    Timing
    Leading
    Direction
    Lower is better
    Unit
    Time
    Window
    Items completed in the calendar month
    Basis
    Completed work items, segmented by type
    Data source
    Issue tracker status history
    Decision it informs
    Cycle time stretching for a work type means items are too big or wait too long: slice them smaller and limit WIP before changing the process.
    Formula
    Done timestamp - Start timestamp (elapsed calendar days)

    Calculator, worked example, common mistakes and formula variants are available after free sign-up

    • Calculator
    • Worked example
    • Common mistakes
    • Formula variants

    Description

    How long work takes once started. Use percentiles and break it down by work type to find bottlenecks.

    Often confused with

    Metric tree

    Open tree

    Related metrics

    These metrics are covered in detail in the LinkedIn Friends All Courses PassTG, YouTube, bots, channels and resources here