Cycle Time
Elapsed time from when work on an item starts to when it is done; the core speed measure of delivery, best read as a percentile by work type.
- List
- Product
- Category
- Process
- Role
- Input
- Timing
- Leading
- Direction
- Lower is better
- Unit
- Time
- Window
- Items completed in the calendar month
- Basis
- Completed work items, segmented by type
- Data source
- Issue tracker status history
- Decision it informs
- Cycle time stretching for a work type means items are too big or wait too long: slice them smaller and limit WIP before changing the process.
- Parent metric
- Formula
- Done timestamp - Start timestamp (elapsed calendar days)
Calculator, worked example, common mistakes and formula variants are available after free sign-up
- Calculator
- Worked example
- Common mistakes
- Formula variants
Description
How long work takes once started. Use percentiles and break it down by work type to find bottlenecks.
Often confused with
Metric tree
Related metrics
These metrics are covered in detail in the LinkedIn Friends All Courses PassTG, YouTube, bots, channels and resources here
