WIP (Work In Progress)
Number of work items started but not finished at a point in time; too much WIP increases context switching and stretches cycle time.
- List
- Product
- Category
- Process
- Role
- Input
- Timing
- Leading
- Direction
- Target range
- Unit
- Count
- Window
- Daily snapshot
- Basis
- Items in active and waiting statuses for the team
- Data source
- Issue tracker board state
- Decision it informs
- WIP above the limit means stop starting and finish what is open; raising the limit only hides the problem in longer cycle time.
- Parent metric
- Formula
- Count(items in progress)
Calculator, worked example, common mistakes and formula variants are available after free sign-up
- Worked example
- Common mistakes
Description
How much work is started but not finished. High WIP increases context switching and often extends cycle time.