    Cost of Delay

    Estimated value lost per week an initiative is delayed, in currency per week; puts urgency into money so competing work can be sequenced.

    Category
    Prioritization
    Role
    Input
    Timing
    Leading
    Direction
    Context
    Unit
    Currency
    Window
    Per week of delay
    Basis
    Initiatives competing for the same team capacity
    Data source
    Product and finance estimates
    Decision it informs
    The initiative with the highest cost of delay per unit of effort goes first; a low cost of delay is a licence to wait.
    Formula
    (Value if shipped now - Value if shipped after the delay) / Delay in weeks
    Numerator
    Difference in expected value (gross profit or cost avoided) between shipping now and shipping after the delay, over the same forecast horizon
    Denominator
    Length of the delay (weeks)

    Calculator, worked example, common mistakes and formula variants are available after free sign-up

    • Calculator
    • Worked example
    • Common mistakes
    • Formula variants

    Description

    Quantifies urgency: how much value is lost by waiting. Use it to sequence work when several initiatives compete for attention.

    Often confused with

    Metric tree

    Open tree

    Related metrics