    Scope Change Rate

    Share of work items in the cycle scope whose scope was added, removed or materially changed mid-cycle; a volatility signal pointing to weak discovery or shifting priorities.

    Category
    Process
    Role
    Input
    Timing
    Leading
    Direction
    Lower is better
    Unit
    Percent
    Window
    Per sprint or cycle
    Basis
    Items committed at cycle start plus items added during it
    Data source
    Issue tracker change history
    Decision it informs
    High scope change means discovery is finished during delivery: push unclear items back to refinement instead of starting them.
    Formula
    Items with scope change / (Items committed at start + Items added) × 100
    Numerator
    Work items with a scope change after the sprint or cycle started
    Denominator
    Unique work items in the cycle scope: committed at cycle start plus added during it

    Calculator, worked example, common mistakes and formula variants are available after free sign-up

    • Calculator
    • Worked example
    • Common mistakes

    Description

    Volatility indicator during execution. High scope change can mean weak upfront discovery or shifting priorities mid-sprint.

    Often confused with

    Metric tree

    Open tree

    Related metrics