Scope Change Rate
Share of work items in the cycle scope whose scope was added, removed or materially changed mid-cycle; a volatility signal pointing to weak discovery or shifting priorities.
- List
- Product
- Category
- Process
- Role
- Input
- Timing
- Leading
- Direction
- Lower is better
- Unit
- Percent
- Window
- Per sprint or cycle
- Basis
- Items committed at cycle start plus items added during it
- Data source
- Issue tracker change history
- Decision it informs
- High scope change means discovery is finished during delivery: push unclear items back to refinement instead of starting them.
- Parent metric
- Formula
- Items with scope change / (Items committed at start + Items added) × 100
- Numerator
- Work items with a scope change after the sprint or cycle started
- Denominator
- Unique work items in the cycle scope: committed at cycle start plus added during it
Calculator, worked example, common mistakes and formula variants are available after free sign-up
- Calculator
- Worked example
- Common mistakes
Description
Volatility indicator during execution. High scope change can mean weak upfront discovery or shifting priorities mid-sprint.