Blocked Work Time Ratio
Share of the total cycle time of completed items spent in an explicitly blocked state; it shows how much delivery time is lost to dependencies and impediments.
- List
- Product
- Category
- Process
- Role
- Input
- Timing
- Leading
- Direction
- Lower is better
- Unit
- Percent
- Window
- Month of completion
- Basis
- Completed items of one workflow with full status history
- Data source
- Issue tracker status and flag history
- Decision it informs
- Decide which dependencies or teams to tackle to unblock flow.
- Parent metric
- Formula
- Sum of blocked time within start to finish / Sum of cycle time × 100
- Numerator
- Sum over items of the union of blocked intervals between start and finish
- Denominator
- Sum of cycle time of the same completed items
Calculator, worked example, common mistakes and formula variants are available after free sign-up
- Calculator
- Worked example
- Common mistakes
Description
Share of cycle time that finished items spent explicitly blocked. It separates dependency and impediment problems from ordinary queueing, which call for different fixes.
Often confused with
Metric tree
- Drives:
Related metrics
These metrics are covered in detail in the LinkedIn Friends All Courses PassTG, YouTube, bots, channels and resources here
