Planned Sample Attainment Rate
Share of completed experiments that collected the sample size their power plan required; a portfolio discipline metric, not the statistical power of any single test.
- List
- Product
- Category
- Experimentation
- Role
- Guardrail
- Timing
- Leading
- Direction
- Higher is better
- Unit
- Percent
- Window
- Quarter
- Basis
- Completed A/B tests with a pre-registered MDE and power target
- Data source
- Experimentation platform
- Decision it informs
- Experiments stopped before reaching sample are not readable: enforce the plan or shrink the experiment before launch, do not read it early.
- Parent metric
- Formula
- Experiments that reached their planned sample size / Completed experiments with a sample plan × 100
- Numerator
- Completed experiments whose randomized sample reached the size required by their pre-registered power plan
- Denominator
- Experiments completed in the period with a valid pre-registered sample plan
Calculator, worked example, common mistakes and formula variants are available after free sign-up
- Calculator
- Worked example
- Common mistakes
- Formula variants
Description
Whether experiments collected the sample size their power plan required. Tests that fall short are likely to miss real effects, and their rare wins overstate the effect.
Often confused with
Metric tree
- Drives:
- Driven by:
Related metrics
These metrics are covered in detail in the LinkedIn Friends All Courses PassTG, YouTube, bots, channels and resources here
