Import Record Completeness
Share of eligible source records that appear correctly in the destination after an import, per the agreed field mapping; it measures data loss that job-level success hides.
- List
- Product
- Category
- Activation
- Role
- Guardrail
- Timing
- Leading
- Direction
- Higher is better
- Unit
- Percent
- Window
- Per finalized import; weekly total as a ratio of sums
- Basis
- Records from imports finalized in the week
- Data source
- Import job logs reconciled with destination tables
- Decision it informs
- Prioritize importer fixes by the formats and sources that lose the most records.
- Parent metric
- Formula
- Eligible source records correctly mapped in the destination / Eligible source records × 100
- Numerator
- Eligible source records verified as present and correctly mapped in the destination after the import is finalized
- Denominator
- All source records eligible for import under rules fixed before the run, rejected ones included
Calculator, worked example, common mistakes and formula variants are available after free sign-up
- Calculator
- Worked example
- Common mistakes
Description
Checks whether an import actually brought all the user's data across, not just whether the job finished. A job that ends green but drops 10% of rows quietly breaks trust during onboarding.
Often confused with
Metric tree
Related metrics
These metrics are covered in detail in the LinkedIn Friends All Courses PassTG, YouTube, bots, channels and resources here
