Articles
    Back to Product Metrics and Formulas

    FDR-Adjusted p-value

    Adjusted p-value of one hypothesis within a declared family, from the step-up FDR procedure; it controls the expected share of false rejections among all rejections.

    Category
    Experimentation
    Role
    Output
    Timing
    Lagging
    Direction
    Context
    Unit
    Ratio
    Window
    One planned final analysis of the whole pre-declared family
    Basis
    All m valid p-values for the declared metrics, variants and segments, non-significant ones included
    Data source
    Experiment assignment logs and the analysis warehouse
    Decision it informs
    Compare adjusted p-values with a pre-chosen FDR level for exploratory families; pick a family-wise procedure for critical guardrails in advance.
    Parent metric
    Formula
    Sort p-values ascending; p_adj(i) = min(1, min over j >= i of m × p(j) / j); return to the original order

    Calculator, worked example, common mistakes and formula variants are available after free sign-up

    • Worked example
    • Common mistakes
    • Formula variants

    Description

    A p-value adjusted for testing many hypotheses at once with the step-up false discovery rate procedure. It keeps the expected share of false wins among declared wins under control when a test reads many metrics or segments.

    Often confused with

    Metric tree

    Open tree

    Related metrics

    These metrics are covered in detail in the LinkedIn Friends All Courses PassTG, YouTube, bots, channels and resources here