A sales lead tells the leadership team that a new vertical is worth "maybe 50 million a year". Nobody has a report. Instead of parking the claim until research comes back, the founder picks up a marker: how many companies, what share would buy, what they would pay, how often. Four factors, four rough guesses, one product. Eight minutes later the room has a number of about 5.4 million, a list of the two factors that matter most, and a reason to stop arguing about the 50.
That move is Fermi estimation, named after Enrico Fermi, who liked to ask students how many piano tuners worked in Chicago. Its value for a business is speed: it gives you an order of magnitude before the decision is due, and it shows which assumption deserves the research budget.
The rule to break: wait for the data before you put a number on it
Most teams treat an unknown quantity as a request for data. Somebody is asked to "look into it", a week passes, and the decision either drifts or gets made on the loudest opinion in the room. The quiet assumption is that a number without a source is worse than no number at all.
Fermi estimation rejects that assumption. A decomposed guess is a model, and a model can be argued with, factor by factor. "The market is 50 million" can only be believed or doubted. "There are 4,000 target firms, 15% would buy, each order is worth 9,000 euros and they buy once a year" can be attacked at four precise points, and each attack improves the estimate.
The method has three moves. First, break the question into factors that multiply or add, each one something a person in the room has a feel for. Second, give each factor a low and a high value you would be surprised to see exceeded. Third, combine them and look at which factor carries the widest range. That last step is where the business value sits, because it tells you what to research.
Fermi's own most famous estimate shows the spirit. At the Trinity test in July 1945 he dropped small pieces of paper as the blast wave passed and, from how far they moved, estimated the yield at roughly 10 kilotons of TNT. Later measurements put it near 21 kilotons, and a 2021 reanalysis of the fallout raised that to about 25. He was off by a factor of two to two and a half, using paper scraps, in seconds. For a go or no-go business decision, a factor of two is usually good enough; a factor of ten is what kills companies.
One rule of thumb: if the decomposition has more than six factors, you have probably hidden a guess inside a guess. Three to five factors keep the model readable on a whiteboard.
The arithmetic that makes rough guesses add up
Why should a chain of rough guesses produce a usable answer? Because errors in independent factors partly cancel. If you overestimate one factor by 40% and underestimate another by 30%, the product lands within 2% of the truth. Over five factors, some errors push up and some push down, and the combined error grows more slowly than the sum of the individual ones.
Two technical habits make this work. The first is to use the geometric mean when you have a low and a high bound. If you think a share sits between 5% and 20%, the arithmetic mean is 12.5%, but the geometric mean is 10%. For quantities that vary by multiples, the geometric mean is the better central guess, because being off by a factor of two in either direction is treated as the same size of mistake.
estimate = f1 x f2 x f3 x ... x fn
central value of a factor: fi = sqrt(low_i x high_i)
spread of a factor: ri = log10(high_i / low_i)
rough total spread: R = sqrt(r1^2 + r2^2 + ... + rn^2)
range of the answer: estimate / 10^(R/2) to estimate x 10^(R/2)
The second habit is to compute the spread per factor and look at which one dominates. A factor with a range of 2x has a log spread of 0.3. A factor with a range of 10x has a log spread of 1.0, and it will swamp everything else in the total. If one factor carries most of the uncertainty, research that factor and leave the rest as guesses.
Douglas Hubbard, in "How to Measure Anything", adds a useful companion called the rule of five: if you randomly sample five items from any population, there is a 93.75% chance that the population median sits between the smallest and largest of the five. Five quick customer calls can tighten a factor that a Fermi model has flagged as wide.
Worked example: annual demand for office coffee machines
Take a question a distributor might bring to a consultant: how many office coffee machines does a country of 10 million people replace each year? All numbers below are illustrative assumptions, chosen to show the mechanics, and not market data.
Start with people. Of 10 million residents, roughly 45% are employed, which gives 4.5 million workers. Next, the share who work in an office rather than in a shop, factory, field or vehicle. A low guess is 30% and a high guess is 55%; the geometric mean is about 41%, so call it 1.8 million office workers. Then density: one machine per 25 people, with a range of 15 to 40. That gives 72,000 machines in service.
Machines wear out. A replacement cycle between 4 and 9 years has a geometric mean of 6 years, so about 12,000 machines are replaced annually. At an average price of 1,500 euros, with a range of 800 to 3,000, the replacement market is near 18 million euros a year.
Now the spread. The office share has a range of 1.8x, a log spread of 0.26. Density has 2.7x, a spread of 0.43. The replacement cycle has 2.25x, a spread of 0.35. Price has 3.75x, a spread of 0.57.
The root sum of squares is about 0.84, so the answer sits roughly between 7 and 47 million euros, with 18 million as the central value. Price is the widest factor, and price is also the one a distributor can check with three phone calls to suppliers. That is the research plan, written in ten minutes.
Mini-case: checking a competitor's revenue claim before a pitch
This case is illustrative, a composite of a situation that comes up often in strategy work. A founder preparing an investor pitch reads that a competitor "passed 40 million euros in annual recurring revenue". The investor deck currently positions the founder's company as a fast follower at 3 million. If the competitor really is at 40 million, the market story changes.
The founder has two public facts: the competitor's website says "trusted by 50,000 businesses", and its entry plan is listed at 30 euros a month. A first Fermi pass multiplies them: 50,000 x 30 x 12 equals 18 million euros. That is less than half the claim.
Three explanations are possible, and each is a factor to check. The average revenue per customer could be higher than the entry plan, perhaps 60 euros a month if half the customers sit on a higher tier. That alone would lift the estimate to 36 million. Or the 50,000 includes free users, which would push the real figure down sharply. Or the 40 million counts something other than recurring revenue, such as services or one-off setup fees.
A second, independent decomposition helps. The competitor's public team page lists about 120 people. If a software business at that stage brings in somewhere between 100,000 and 250,000 euros per employee, revenue lands between 12 and 30 million euros, with a geometric mean near 19 million. Two different paths, both landing near 18 to 19 million, are stronger evidence than either path alone.
The founder rewrote one slide. Instead of "competitor at 40 million", the deck said the competitor was "likely between 15 and 35 million on public signals", and named the assumptions. An investor asked about the gap, the founder walked through the two decompositions, and the conversation moved on to the founder's own numbers.
Support hires, a meeting's cost and warehouse space
How many support agents does a launch need? Expected new customers in month one, say 2,000. Share who contact support in the first 30 days, guess 25% with a range of 15% to 40%. Contacts per customer who reaches out, about 2. Minutes per contact, about 12. That gives 2,000 x 0.25 x 2 x 12, which is 12,000 minutes, or 200 hours.
At 120 productive support hours per agent per month, you need two agents, and a third if the 40% bound turns out real. The decision is about the third hire, so the factor to test is the contact rate, which a beta group of 100 customers can reveal.
What does the weekly all-hands cost? Forty people, 60 minutes, a loaded cost of 50 euros an hour. That is 2,000 euros a week, 104,000 euros a year. The point of the estimate is to make the meeting compete with other uses of 100,000 euros; it does not decide the meeting's fate by itself.
How much warehouse space does a growing e-commerce brand need next year? Average orders per day, units per order, days of stock held, units per pallet, square metres per pallet position. Peak days drive packing staff, not storage, so the average is the right input. A brand averaging 300 orders a day with 1.5 units each and holding 45 days of stock keeps around 20,000 units.
At 200 units per pallet that is 100 pallet positions, and with racking at roughly 1.2 square metres per position plus aisles doubling the footprint, about 240 square metres. The widest factor is days of stock, which is a policy choice, so the estimate turns a property question into an inventory question.
Where Fermi estimates mislead, and how to catch it
The strongest objection to the method is that it produces false confidence. A number on a whiteboard looks like knowledge, and a team that has done the maths once may stop questioning it. The objection is fair. A Fermi estimate fails in four recognisable ways.
- Correlated errors. Error cancellation assumes independent factors. If every factor is optimistic because the person estimating wants the project to happen, the errors stack instead of cancelling, and the result can be off by 5x or more.
- A missing factor. The coffee machine model ignores leased machines that are refurbished and redeployed rather than replaced. A missing factor does not show up in the spread calculation at all.
- Anchoring on the first number spoken. When the sales lead says 50 million first, every factor drifts upward. Ask people to write their bounds silently before anyone speaks.
- The wrong question. A precise estimate of market size is useless if the real question was whether customers will switch from their current supplier.
Philip Tetlock's work on forecasting, summarised in "Superforecasting", describes good forecasters breaking questions into smaller ones in exactly this way, and then checking against a base rate: how often do things of this kind happen? That second step is the guard against correlated optimism. Before trusting a bottom-up estimate of first-year revenue, ask what share of comparable launches you know reached that figure.
So when should you skip the Fermi estimate and get the data? When the decision is irreversible and expensive, when the data already exists and costs less than a day to pull, or when the widest factor cannot be bounded within 10x. In those cases the estimate still has a job: it tells you which data to request. A decomposition that took ten minutes can save a two-week research brief from asking the wrong question.
Back in the opening meeting, the 50 million shrank to about 5.4 because someone wrote 15% next to "would buy". That share is also the factor the room argued about most, so it becomes the brief: twenty calls to target firms will show whether the true share sits nearer 5% or 30%. Firm count, order value and frequency can stay rough. Research the one factor that moves the answer.